K-Electric has announced a planned power shutdown on May 21, 2025, for necessary maintenance work in different parts of Karachi. The shutdown will affect 55 feeders across the city and is expected to last between 8 to 10 hours, depending on the area.
The power cuts will take place between 8:00 AM and 6:30 PM, with timings varying for each location. KE says this maintenance work is essential for improving system performance and ensuring better service in the future.
Residents are advised to prepare in advance and stay updated through official KE channels.
Here are the 55 areas that will face power suspension:
- 35th Street Kh-e-Khaidi S/S-33
- Abdullah Shah Ghazi Goth
- Ajmair Garden
- Al-Ahmed Avenue
- Al-Hira Pumping
- Ambaji Villa RMU
- Amjad Ali Wells
- Ayubbia Comm Phase-7 Ext.
- Bashir Chowk (Kali Market)
- Dada Terrace
- Defence Pumping-4
- Deh Shah Mureed
- Drigh Road A
- Falak Naz Plaza
- Ghousia Bakery
- Gulshan e Askari
- Hassan Barohi Goth
- Health Care Unit (P-80)
- HEF School
- Huderwa
- Ibrahim Hyderi RMU
- Kashan-e-Tufal RMU
- Khayyam Town
- Kh-e-Jami RMU
- Kh-e-Rahat Park S/S
- Lashari Goth
- Malir Colony ‘C’
- Marhaba Galaxy
- Masjid-e-Aqsa
- Maymar Complex
- Mulla Essa Goth RMU
- Muslim Gym Khana
- Noor Bhouy
- Noor Hamza Masjid
- Noor Housing
- Nowsherwanjee
- P-23 Qaim Khani RMU (listed twice, possibly two feeders)
- Parco-III
- Pipe Factory
- Pole-20
- Raita Plot
- Rehbar Club
- Rice Grinding
- Rizwan Plaza
- RK Studio
- Saghir Center (Rashid Minhas)
- Sec-10 RMU
- Sector E-8 S/S-03
- Shaikh Bros.
- Shumail Complex
- Sindh Town
- Uni Gold RMU
- Vocational Institute
K-Electric has emphasized that this is a routine maintenance activity aimed at strengthening Karachi’s power infrastructure.